Solar panels in Mohammedia, Morocco: output, cost and payback
In Mohammedia, each kWp of solar panels produces about 1,632 kWh a year. For an electricity bill of 500 MAD a month, a 1.5 kWp system (about 16,500 MAD) saves around 2,431 MAD a year and pays for itself in 7.3 years.
Calculate for my address in Mohammedia →Solar output in Mohammedia is 2% below the average of the 35 cities studied.
Payback by electricity bill
| ONEE bill | Consumption | Recommended size | Investment | Output | Year-1 savings | Payback | Net gain over 25 years |
|---|---|---|---|---|---|---|---|
| 300 MAD/month | 257 kWh/month | 1 kWp (2 panels) | 11,000 MAD | 1,632 kWh/yr | 1,216 MAD | 9.9 years | 22,765 MAD |
| 500 MAD/month | 362 kWh/month | 1.5 kWp (3 panels) | 16,500 MAD | 2,447 kWh/yr | 2,431 MAD | 7.3 years | 52,377 MAD |
| 800 MAD/month | 534 kWh/month | 2.5 kWp (5 panels) | 27,500 MAD | 4,079 kWh/yr | 3,754 MAD | 7.9 years | 78,337 MAD |
| 1,200 MAD/month | 752 kWh/month | 4 kWp (8 panels) | 44,000 MAD | 6,526 kWh/yr | 5,585 MAD | 8.6 years | 112,678 MAD |
Your roof, its orientation and your quote change these figures. The simulator recalculates them for your exact address, with your actual roof area.
Month-by-month solar output in Mohammedia
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 116 | 116 | 138 | 145 | 150 | 149 | 160 | 159 | 143 | 132 | 111 | 114 |
Frequently asked questions
How much does a solar panel produce in Mohammedia?
A well-oriented 500 Wp panel produces about 816 kWh a year in Mohammedia, or 1,632 kWh per installed kWp (PVGIS, roof tilted 30° due south). Output ranges from 111 kWh per kWp in the weakest month to 160 kWh in the strongest.
How much does a home solar system cost in Mohammedia?
For a home with a 500 MAD monthly bill, you need about 1.5 kWp, or 3 panels, for a budget of around 16,500 MAD at 11 MAD per watt-peak. The actual price depends on the installer, the equipment and the roof.
Is solar worth it in Mohammedia?
For most households, yes: with a 500 MAD monthly bill, the system pays for itself in 7.3 years and returns about 52,377 MAD net over 25 years. A high bill usually pays back faster, because its kWh cost more and solar can bring the home down a tranche of the ONEE tariff.
Can you sell surplus solar power to the grid in Mohammedia?
Morocco's self-generation law 82-21 allows surplus power to be fed into the grid, capped at 20% of yearly output. The residential buy-back tariff has not been published yet, so the figures on this page leave it out: they are conservative estimates.
Method and sources
- Output: PVGIS v5.2 (European Commission Joint Research Centre), at the city centre, rooftop panels tilted 30° due south, 14% system losses.
- Savings: ONEE low-voltage residential tariff (tax included), month by month. Up to 150 kWh each tranche has its own price; above that the whole month is billed at the price of the tranche reached, so dropping a tranche saves more than the kWh replaced. Consumption runs a little higher in winter and midsummer. The share used on site depends on system size, for a home sometimes occupied in daytime; no surplus sales. The bill's fixed charges and taxes are not counted.
- Sizing: the size that earns the most over 25 years, to half a kWp, from 1 to 10 kWp, with 500 Wp panels. A smaller system pays back faster: the simulator offers both.
- Cost: 11 MAD per installed watt-peak (an assumption: use your installer's quote). Maintenance 1% a year, 0.5% yearly output loss, 2% yearly tariff rise, 25-year life.
Other cities
Same region: Casablanca (1,646 kWh/kWp) · El Jadida (1,692 kWh/kWp) · Settat (1,653 kWh/kWp) · Berrechid (1,620 kWh/kWp)
Rabat · Marrakesh · Fez · Tangier · Agadir · Meknes · Oujda · Kenitra · Tetouan · Salé · Temara · Safi · Essaouira · Benguerir · Beni Mellal · Khouribga · Nador · Al Hoceima · Larache · Taza · Ifrane · Khemisset · Inezgane · Taroudant · Tiznit · Ouarzazate · Errachidia · Guelmim · Laayoune · Dakhla
Guides: how many panels? · installation cost · ONEE tariff · Law 82-21 · Taqa Pro installers